close
Jump to content

Mission Park station

Mission Park
BERJAYA
An outbound train at Mission Park station in 2022
General information
LocationHuntington Avenue at Mission Park
Boston, Massachusetts
Coordinates42°20′00″N 71°06′34″W / 42.3332°N 71.1095°W / 42.3332; -71.1095
PlatformsNone (passengers wait on sidewalk)
Tracks2
ConnectionsBERJAYA MBTA bus: 39, 66
Construction
AccessibleNo
History
RebuiltFall 2027– Late 2029 (planned)
Passengers
2011548 daily boardings[1]
Services
Preceding station BERJAYA MBTA Following station
Riverway Green Line Fenwood Road
Location
Map

Mission Park station is a light rail stop on the Green Line E branch of the MBTA subway system, located on Huntington Avenue in the Mission Hill neighborhood of Boston, Massachusetts. The station is located on a street running segment of the E branch; trains run in mixed traffic rather than a dedicated median. The station has no platforms; riders wait on the sidewalks (shared with bus stops for the route 39 and 66 buses) and cross the street to reach trains.[2] Mission Park station is not accessible, a reconstruction for accessibility is planned between 2027 and 2029.[1]

Reconstruction

[edit]

In 2021, the MBTA indicated plans to modify the Heath StreetBrigham Circle section of the E branch with accessible platforms to replace the existing non-accessible stopping locations.[3] The new platforms are planned to be long enough to accommodate two 110-foot (34 m) Type 10 vehicles. Design work began in July 2023.[4][5] In December 2024, the MBTA indicated that platforms would be built at Riverway and Mission Park, while Fenwood Road and Back of the Hill would be closed.[6] As of December 2025, design work is expected to be completed in late 2026, with construction taking place in 2027–2029.[7]

References

[edit]
  1. 1 2 "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
  2. "Mission Park Station Neighborhood Map" (PDF). Massachusetts Bay Transportation Authority. July 2012. Archived from the original (PDF) on March 31, 2016. Retrieved December 20, 2016.
  3. Peña, Angel (June 21, 2021). "Green Line Transformation (GLT) Update" (PDF). Massachusetts Bay Transportation Authority. p. 7.
  4. "System-Wide Accessibility Initiatives—November 2023" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. November 27, 2023. p. 5.
  5. "Accessibility Initiatives—June 2024" (PDF). Massachusetts Bay Transportation Authority. June 25, 2024. p. 5.
  6. "Accessibility Initiatives—December 2024" (PDF). Massachusetts Bay Transportation Authority. December 6, 2024. p. 5.
  7. "Accessibility Initiatives—December 2025" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. December 2, 2025. p. 5.
[edit]

Wikimedia Commons logo Media related to Mission Park station at Wikimedia Commons