close
Jump to content

Bina–Katni line

From Wikipedia, the free encyclopedia

Bina–Katni line
BERJAYA
Katni Murwara junction is an important Railway Station on Bina–Katni line
Overview
StatusOperational
OwnerIndian Railways
LocaleMadhya Pradesh
Termini
Service
OperatorWest Central Railway
DepotNew Katni
Rolling stockWDM-2, WDM-3A, WDG-3A, WDG-3C, WAG-5 and WAG-7
Technical
Line length262 km (163 mi)
Track gauge5 ft 6 in (1,676 mm) broad gauge
ElectrificationYes
Operating speed100 km/h (62 mph)
Route map

km
BERJAYA
to Agra–Bhopal section
BERJAYA
0
Bina Junction
BERJAYA
BERJAYA
BERJAYA
to Indore–Gwalior line / Guna Junction
BERJAYA
BERJAYA
BERJAYA
to Agra–Bhopal section / Agra
BERJAYA
BERJAYA
BERJAYA
5
Bina Malkhedi
BERJAYA
10
Baghora
BERJAYA
22
Khurai
BERJAYA
31
Sumreri
BERJAYA
40
Jeruwa Khera
BERJAYA
49
Isarwara
BERJAYA
56
Nariaoli
BERJAYA
67
Ratona
BERJAYA
75
Saugor
BERJAYA
82
Makronia
BERJAYA
89
Lidhora Khurd
BERJAYA
99
Girwar
BERJAYA
106
Dangidhar
BERJAYA
113
Ganeshganj
BERJAYA
126
Patharia
BERJAYA
139
Aslana
BERJAYA
152
Damoh
BERJAYA
160
Karhiya Bhadoli
BERJAYA
167
Bandakpur
BERJAYA
178
Ghatera
BERJAYA
186
Golapatti
BERJAYA
194
Sagoni
BERJAYA
205
Ratangaon
BERJAYA
212
Salaia
BERJAYA
222
Bakhleta
BERJAYA
231
Rithi
BERJAYA
237
Patohan
BERJAYA
246
Hardua
BERJAYA
255
Majhagawan Phatak
BERJAYA
260
Katni Murwara
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
263
Katni Junction
BERJAYA
BERJAYA
BERJAYA
on Allahabad–Jabalpur section
BERJAYA
266
New Katni Junction
BERJAYA
BERJAYA
To Chunar-Garwa Road line
BERJAYA
To Bilaspur–Katni line

The Bina–Katni line is the railway route between Bina Junction of Bina and New Katni Junction of Katni in Madhya Pradesh, India.

History

[edit]

The line was established in the year 1923 before India got independence, making it one of the oldest train routes in India.[citation needed] It was started with a single track which was later converted to double track in 1982.[citation needed] It got electrified in year 1994–95.[1][2]

Important trains passing through

[edit]

The line serves important stations for both goods as well as passenger express and mail trains. The important trains include :

Trains waiting for approval

[edit]

As per demands and to reduce passenger traffic of the route, a few trains were demanded which though got the green signal (but these were not announced in the Rail Budget) from the parliament but just waiting for approval by the railway minister. These demanded trains include :

  • Bhopal–Saugor Passenger by extending Bhopal–Bina Passenger to Saugor
  • Nagpur–Rewa Superfast Express
  • Sagar-Nagpur Express
  • Nagpur Prayagraj (via Bhopal) express

Stations on this railway section

[edit]

On the route, the following are the main railway stations :

References

[edit]
  1. "Brief on Railway Electrification" (PDF). Retrieved 11 December 2025.
  2. "History of Indian Railways from 1853 to Present". Jagranjosh.com. 9 February 2022. Retrieved 11 December 2025.
[edit]