Turin–Milan railway

From Wikipedia, the free encyclopedia
(Redirected from Turin-Milan railway)
Turin–Milan railway
BERJAYA
The railway near Novara
Overview
Native nameFerrovia Torino-Milano
Statusin use
OwnerRFI
LocaleItaly
Termini
Stations18 station, 8 stops
Service
Typeheavy rail
ServicesS6
Operator(s)Trenitalia, Trenord
History
Opened1 July 1859 (1859-07-01)
Technical
Line length153 km (95 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification3 kV DC
Operating speed160 km/h (99 mph)
Route map

km
BERJAYA
BERJAYA
BERJAYA
BERJAYA
(0.000)
Torino Lingotto
BERJAYA
BERJAYA
BERJAYA
0.000
Torino Porta Nuova
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
1.092
0.000
start of Turin-Novara
BERJAYA
BERJAYA
BERJAYA
1.400
Copertura Trincea tunnel
(2253 m)
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
1.465
Zappata 4-way junction
BERJAYA
BERJAYA
BERJAYA
2.139
Crocetta junction
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
3.653
4-track tunnel to the east
(4446 m)
BERJAYA
3.943
Torino Porta Susa
opened 2008
BERJAYA
3.943
Torino Porta Susa
1856–2009
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
Torino Dora (under reconstruction)
to Ceres
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
(9+359)
Torino Rebaudengo Fossata
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
8.099
BERJAYA
BERJAYA
BERJAYA
BERJAYA
10.935
Torino Stura
BERJAYA
BERJAYA
BERJAYA
BERJAYA
12.347
link
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
14.062
14.014
Settimo Torinese junction
from Turin Passante
BERJAYA
BERJAYA
BERJAYA
BERJAYA
15.763
Settimo
BERJAYA
BERJAYA
BERJAYA
Torino-Settimo Torinese
interurban tramway (1884–1954)
BERJAYA
BERJAYA
BERJAYA
22.896
Brandizzo
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
27.251
Chivasso
184 m a.s.l.
BERJAYA
BERJAYA
BERJAYA
30.763
Castelrosso
BERJAYA
BERJAYA
30.783
Castelrosso junction
(to Alessandria)
BERJAYA
33.395
Torrazza Piemonte
BERJAYA
BERJAYA
38.391
Saluggia
BERJAYA
41.186
Sant'Antonino di Saluggia
BERJAYA
BERJAYA
45.403
Livorno Ferraris
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
49.796
Bianzè
BERJAYA
55.396
Tronzano
BERJAYA
BERJAYA
57.933
Santhià
BERJAYA
BERJAYA
BERJAYA
to Biella and Arona
BERJAYA
63.584
San Germano Vercellese
BERJAYA
68.483
Olcenengo
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
Vercelli–Trino (closed 1949), V–Aranco
(c. 1933) and V–Biella (c. 1933) interurbans
BERJAYA
77.054
Vercelli
128 m a.s.l.
BERJAYA
Sesia river
BERJAYA
BERJAYA
79.348
Sesia junction
BERJAYA
BERJAYA
BERJAYA
Vercelli-Biandrate-Fara
interurban tramway
BERJAYA
82.051
Borgo Vercelli
BERJAYA
BERJAYA
88.937
Ponzana
BERJAYA
Agogna torrent
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
Novara FNM
(old)
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
98.940
Novara / Novara Nord
151 m a.s.l.
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
Novara Boschetto
link to Turin–Milan (HS)
BERJAYA
BERJAYA
BERJAYA
Novara–Vigevano–Ottobiano
interurban tramway
BERJAYA
BERJAYA
BERJAYA
108.464
Trecate
BERJAYA
BERJAYA
BERJAYA
Novara–Vigevano–Ottobiano
interurban tramway
BERJAYA
BERJAYA
113.982
BERJAYA
120.421
Magenta
BERJAYA
123.688
Corbetta-Santo Stefano Ticino
(opened 1936)[1]
BERJAYA
BERJAYA
BERJAYA
Milano–Castano Primo
interurban tramway
BERJAYA
BERJAYA
BERJAYA
BERJAYA
126.206
Vittuone-Arluno
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
131.037
Pregnana Milanese
(opened 2009)[2][3]
BERJAYA
BERJAYA
BERJAYA
133.381
BERJAYA
BERJAYA
134.571
16.348
Rho
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
"Varese" lines / "Novara" lines
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
12.618
Rho Fiera
opened 2008
BERJAYA
BERJAYA
BERJAYA
8.526
Milano Certosa
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
Milano Villapizzone
opened 2002
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
Milano Bovisa FS
closed 1997
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
Farini marshalling yard
BERJAYA
BERJAYA
BERJAYA
BERJAYA
Milano Porta Garibaldi
BERJAYA
BERJAYA
BERJAYA
BERJAYA
Left arrowopened 1963 (surface)
Left arrowLeft arrowopened 1997 (underground)
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
0.000
Milano Centrale
km
Source: Italian railway atlas[4]

The Turin–Milan railway is a major Italian railway that links the cities of Turin and Milan. The railway is double track, standard gauge and fully electrified at 3 kV DC. It connects the cities of Settimo Torinese, Chivasso, Santhià, Vercelli, Novara, Magenta and Rho. Since February 2006 high-speed trains have operated over the Turin–Milan high-speed line between Turin and Novara. The remainder of the high-speed line between Novara and Milan was opened in December 2009, when the Bologna–Florence high-speed line and the remaining sections of the Rome–Naples high-speed railway line and the Naples–Salerno high-speed line are opened, completing the high-speed network between Turin and Salerno.

History

[edit]

Construction and opening

[edit]

The line was built by Thomas Brassey under contract to the Società Vittorio Emanuele ("Victor Emmanuel Company", named in honour of Victor Emmanuel II, then king of Piedmont and Sardinia) and opened between Turin and Novara on 20 October 1856 and extended to the Ticino river—which formed the boundary between Piedmont and the Kingdom of Lombardy–Venetia (then part of the Austrian Empire)—on 18 October 1858. The bridge over the river connecting to the existing railway from Milan at Magenta was opened on 1 June 1859.

Three days later the French-Sardinian army led by Napoleon III defeated the Austrians at the Battle of Magenta with the help of supplies brought by the new railway. This was a major step in the unification of Italy.[5]

The line formed part of the Società per le strade ferrate dell'Alta Italia (Upper Italian Railways) from 1865 and the Società per le Strade Ferrate del Mediterraneo (Mediterranean Railway Company) from 1885.

In the twentieth century

[edit]
BERJAYA
An intercity at Ponzana

Following the nationalisation of the railways, the line was incorporated into the state network and its operation was taken over by Ferrovie dello Stato between 1905 and 1906.

The line was severely damaged during the Second World War. In 1951, it was restored to operation, albeit temporarily, in some parts.

The main line from Novara to Rho was electrified from the timetable change in May 1960.[6] The missing section from Turin to Novara was electrified the following year and inaugurated on 4 June in the presence of the Minister of Transport Giuseppe Spataro,[7] on the occasion of the 100th anniversary of the unification of Italy.[8]

At the beginning of the 2000s, the management of the line passed to Rete Ferroviaria Italiana.

Features

[edit]

The line is double-track, electrified at 3,000 volts DC and standard-gauge with a length of 153 kilometres (95 mi). Its infrastructure manager, RFI classifies it as a "fundamental line".[9]

The line has five junction stations, Settimo, Chivasso, Santhià, Vercelli and Novara. Lines branch off as follows: from Settimo to Pont Canavese; from Chivasso to Ivrea/Aosta, Asti and Alessandria; from Santhià to Arona and Biella; from Vercelli to Casale and Pavia; and from Novara to Biella, Alessandria/Arona, Domodossola and Varallo Sesia. The railway line is paralleled by the Turin–Milan high-speed railway, which crosses it several times during its journey, with connections at several points, including at: Torino Stura, Settimo, Bianzè, Novara and Rho Fiera. Trains can reach a top speed of 160 km/h on most of the line and between Magenta and Pregnana Milanese the speed limit is 180 km/h.[10]

Operations

[edit]

The line is used by freight and passenger trains of various categories, which are operated by various companies.

Trenitalia operates the following services each day:

  • twenty pairs of fast regional trains between Turin and Milan;
  • regional trains on the Novara/Vercelli–Chivasso–Turin/Ivrea route;
  • a pair of InterCity services between Turin and Milan;
  • two pairs of InterCity Night services between Turin and Reggio Calabria.

In addition six TGV services a day are operated on the Milan–Turin–Paris route;

The Novara–Milan section is also used by line S6 of the Milan suburban railway service, operated by Trenord, while the Chivasso–Turin section is used by line 2 of the Turin metropolitan railway service, operated by Trenitalia.

See also

[edit]

References

[edit]
  1. Ferrovie dello Stato, Service order no. 25, 1936
  2. RFI S.p.A. Departmental Circular MI 19/2009. p. 2.
  3. "Impianti FS". I Treni (in Italian) (317): 6. July 2009.
  4. Atlante ferroviario d'Italia e Slovenia [Railway atlas of Italy and Slovenia] (in Italian). Cologne: Schweers + Wall. 2010. pp. 19–21, 31, 120, 124, 130–33. ISBN 978-3-89494-129-1.
  5. Kalla-Bishop, P. M. (1971). Italian Railways. Newton Abbott, Devon, England: David & Charles. p. 26.
  6. Leppo, Ettore (June 1960). "Giugno T.E.". Voci della Rotaia (in Italian). III (6): 6.
  7. Marello, Renzo (June 1961). "T.E. sulla Milano-Torino. 3000 Volt sulla Modane-Alessandria". Voci della Rotaia (in Italian). IV (6): 3.
  8. Ballatore, Luigi (2002). Storia delle ferrovie in Piemonte (in German). Il Punto. pp. 55–61.
  9. "La rete oggi in: Piemonte" (in Italian). www.rfi.it. Retrieved 7 August 2018.
  10. "RFI, Fascicolo Linea 22" (in Italian). RFI.
[edit]

Wikimedia Commons logo Media related to Turin–Milan railway at Wikimedia Commons