close
Jump to content

Mildura railway line

From Wikipedia, the free encyclopedia
(Redirected from Mildura line)

Mildura
Overview
Other nameYelta
StatusOperational
OwnerVicTrack
LocaleVictoria, Australia
Termini
Service
TypeHeavy rail
ServicesMaryborough
Operator(s)Passenger: V/Line
Freight: Pacific National
History
Commenced1874 (1874)
Completed1903 (1903)
Closed for gauge conversionAugust 2017 (Yelta-Maryborough)
ReopenedFebruary 2018 (Yelta-Maryborough)
Technical
Line length474.4 km (294.8 mi)
Number of tracks1
Track gauge
  • 1,435 mm (4 ft 8+12 in) standard gauge between Yelta and Maryborough
  • 1,600 mm (5 ft 3 in) between Maryborough and Ballarat
Old gauge1,600mm (5 ft 3 in) broad gauge (Maryborough-Yelta)
Route map

km
BERJAYA
588.2
Yelta
BERJAYA
583.7
Merbein West
BERJAYA
579.0
Merbein
BERJAYA
567.8
Mildura
BERJAYA
561.1
Irymple
BERJAYA
553.5
Red Cliffs
BERJAYA
BERJAYA
BERJAYA
551.2
Yatpool
BERJAYA
536.6
Carwarp
BERJAYA
528.3
Boonoonar
BERJAYA
BERJAYA
BERJAYA
528.3
Nowingi
BERJAYA
501.5
Hattah
BERJAYA
489.0
Trinita
BERJAYA
475.9
Kiamal
BERJAYA
467.3
Ouyen
BERJAYA
BERJAYA
BERJAYA
459.0
Nunga
BERJAYA
453.0
Bronzewing
BERJAYA
443.4
Gypsum
BERJAYA
434.9
Tempy
BERJAYA
428.4
Speed
BERJAYA
421.6
Turiff
BERJAYA
410.9
Gama
BERJAYA
402.2
Lascelles
BERJAYA
390.6
Woomelang
BERJAYA
380.3
Watchpuga
BERJAYA
368.9
Curyo
BERJAYA
363.5
Kinnabulla
BERJAYA
348.0
Birchip
BERJAYA
336.1
Morton Plains
BERJAYA
328.3
Watchem
BERJAYA
319.8
Massey
BERJAYA
311.2
Litchfield
BERJAYA
302.8
Buloke
BERJAYA
296.1
Donald
BERJAYA
284.0
Cope Cope
BERJAYA
276.4
Swanwater
BERJAYA
268.9
Sutherland
BERJAYA
257.7
St Arnaud
BERJAYA
245.8
Caraporee
BERJAYA
236.2
Emu
BERJAYA
224.1
Bealiba
BERJAYA
211.1
Goldsborough
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
204.6
Dunolly
↑ standard gauged in 2018
↓ dual gauged in 1996
BERJAYA
197.3
Bet Bet
BERJAYA
194.6
Havelock
BERJAYA
189.4
Simson
BERJAYA
BERJAYA
BERJAYA
BERJAYA
182.5
Maryborough
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
dual gauge under construction
BERJAYA
174.8
Daisy Hill
BERJAYA
168.4
Talbot
BERJAYA
151.0
Clunes
BERJAYA
146.3
Tourello
BERJAYA
BERJAYA
BERJAYA
134.9
North Creswick
BERJAYA
133.0
Creswick
BERJAYA
128.4
Bald Hills
BERJAYA
125.3
Sulky
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
123.6
Waubra Junction
BERJAYA
BERJAYA
BERJAYA
North Ballarat Junction
Serviceton line

BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA
BERJAYA

The Mildura railway line is a heavy rail line in northwestern Victoria, Australia. The line runs from Yelta station to Ballarat station via the settlements of Mildura, Ouyen and Maryborough in an approximate south-southeasterly direction. Initial sections of the line opened from Ballarat in 1874 and the line reached Mildura in 1903.

The line is primarily utilised by freight services. V/Line passenger services also operate on the line between Maryborough and Ballarat.

History

[edit]
BERJAYA
Maryborough station

The Mildura line was opened from Ballarat to Creswick, Clunes, Maryborough and Dunolly in 1874 and 1875, and extended to St Arnaud in 1878, Donald in 1882, Birchip in 1893, Woomelang in 1899, Ouyen, Red Cliffs and Mildura in 1903, Merbein in 1910 and Yelta in 1925.[citation needed]

A line was opened from Ballarat to Waubra in the 1880s. It closed in the 1960s.[citation needed]

A branch line was built from North Creswick to Daylesford in 1887, connecting with the line from Carlsruhe. It had stations at Broomfield, Allendale, Newlyn, Rocklyn, Wombat, Leonard, Sailor's Falls and Woodburn. This line closed in 1953.[citation needed]

A line was opened from Maryborough to connect with the Melbourne–Bendigo line at Castlemaine in 1874. This line has been partly dismantled, with only the section from Castlemaine to Maldon Junction still in use, as part of the Castlemaine to Maldon Victorian Goldfields Railway.[citation needed]

Another branch line was opened from Maryborough to Avoca in 1876 and Ben Nevis and Ararat in 1890. This line was closed in 1959, reopened in 1966, standardised in 1996 and closed again in 2005. It was then reopened to regular traffic in 2019 as part of the Murray Basin Rail Project. The Navarre line opened from Ben Nevis to Navarre in 1914 and it was closed in 1954.[citation needed]

A line was opened from Dunolly to Inglewood in 1888, connecting with the BendigoBoort line, completed in 1883.[citation needed]

BERJAYA
Mildura station

The Pinnaroo line (Victoria) opened from Ouyen to Murrayville in 1912 and the South Australian border in 1915, connecting with the Pinnaroo line (South Australia) to Pinnaroo and Tailem Bend. The Genesee & Wyoming Australia line west of Pinnaroo was standardised in 1998 creating a break-of-gauge. Nevertheless, it is proposed to standardise the line from Geelong to Mildura and the line between Ouyen and Pinnaroo. In 2006, state and federal money was announced to upgrade the line to Mildura with gauge convertible sleepers. However, this upgrade will still leave the passenger service in limbo.[citation needed]

The Morkalla line was completed from Red Cliffs to Meringur in the 1920s and extended to Morkalla in the 1930s. This line closed in the 1980s. A 2 km section of the line near Red Cliffs has been converted to a 610 mm-gauge steam railway, operated occasionally by the Red Cliffs Historical Steam Railway (see Victorian Tourism).[citation needed]

In 1923, a series of sidings were placed between the Mildura station and the wharves on the Murray River. These included a zig zag section to enable trains to travel between the different elevations. These sidings were removed in 1973.[1]

A passenger service was provided by V/Line with three weekly overnight services from Melbourne (known as The Vinelander), including sleeping cars and a Motorail service, until 1993 when it was discontinued by the Kennett Government.[2] The former Bracks/Brumby Governments promised to re-open this line to passenger traffic as part of their pledges for the 1999, 2002 and 2006 elections. They also pledged the reopening of Clunes station in the 2010 election.[citation needed]

In December 2007 work began on upgrading the line between Gheringhap (on the Geelong–Ballarat line) and Mildura, at a cost of $73 million and involving one in every two sleepers being replaced, and lifting maximum train speeds to 80 km/h (50 mph).[3] Current speeds are restricted to 50 km/h on one-third of the track and are as low as 30 km/h in some sections.[4] In April 2008 it was announced that the Mildura–Yelta section of the line would also be upgraded, as part of the Victorian core grain network in a $23.7 million package with 6 other lines.[5]

As part of upgrades for the return of Maryborough passenger services, the crossing loops at Sulky, Tourello and Talbot stations have been removed, resulting in only one train at a time being able to use the 60 kilometres of line between Ballarat and Maryborough.[6] The loop at Sulky was removed on 12 February, the loop at Talbot on 24 February.[7]

In October 2010, the Victorian government released a report into public transport improvement options for the north-west of Victoria, outlining nine proposals for public transport projects. Options discussed include the return of passenger trains on the existing line, or via an extension of the Yungera line to connect to the Mildura line at Ouyen.[8][9]

Passenger services were reintroduced from Ballarat to Maryborough in July 2010, after a 17-year absence.[10][11]

The line closed in August 2017 north of Dunolly for conversion to standard gauge as part of the Murray Basin Rail Project.[12] It reopened gradually from February 2018 with maximum axle load lifted to 21 tonnes and line speed increased to 80 km/h.[13]

Despite reopening to passenger traffic in 2010, the line has continued to have very low patronage figures across all the stations on the Maryborough Line. Creswick and Talbot Railway Stations served less than 400 passengers a year in the 2020–2021 patronage figures, down from only 1,000 prior to the Covid-19 Pandemic. Clunes Station also records less than 1,000 annual passenger movements. The terminus of the current passenger services, Maryborough, serves approximately 3,600 passenger per year.[14] In 2018–19 however, Maryborough had patronage figures of around 9,350 per annum or 25 passengers per day. There has been on-going discussions about the viability of the railway service to Maryborough with such low patronage on all stations along the branch line. [citation needed] [by whom?]

Services

[edit]

The main freight traffic on the line is export grain and containerised wine, grapes, citrus, dried fruit and juice, totalling around 1.5 million tonnes per year. Containers are dispatched to Melbourne from a terminal at Merbein (a short distance north of Mildura) operated by Seaway Intermodal,[15][16] which handles approximately 13,000 export containers a year, as well as 500 import containers.[17] Cement was also despatched to Mildura from Waurn Ponds until 2015, oil and less than container load (LCL) freight were carried until 2007.[18] A freight terminal also exists at Donald, and grain services run as required.[citation needed]

Maryborough services

[edit]
Maryborough V/Line rail service
h:mm
0:00
BERJAYA
0.0 km
Southern Cross
Zone 1
0:07
BERJAYA
5.6 km
Footscray
Zone 1
0:12
BERJAYA
12.3 km
Sunshine
Zone 1/2
0:16
BERJAYA
15.1 km
Ardeer
Zone 2
0:18
BERJAYA
17.9 km
Deer Park
Zone 2
0:23
BERJAYA
21.2 km
Caroline Springs
Zone 2
0:28
BERJAYA
30.2 km
Rockbank
Zone 2
BERJAYA
34.3 km
Cobblebank
Zone 2
0:33
BERJAYA
41.3 km
Melton
Zone 2
0:45
BERJAYA
52.9 km
Bacchus Marsh
Zone 2
1:02
BERJAYA
79.5 km
Ballan
Zone 4
1:24
BERJAYA
113.8 km
Ballarat
Zone 8
BERJAYA
BERJAYA
1:44
BERJAYA
132.9 km
Creswick
Zone 9
1:56
BERJAYA
151.1 km
Clunes
Zone 11
2:08
BERJAYA
168.3 km
Talbot
Zone 13
2:22
BERJAYA
182.5 km
Maryborough
Zone 14
Some timetabled journey to Southern Cross.
Most services run between Ballarat and Maryborough only.

As part of the Victorian Transport Plan, the State Government announced passenger rail services on the Mildura line would be reintroduced up to Maryborough, with services beginning in 2010.[19][20]

History of passenger services

[edit]

Opening train

[edit]

The first passenger services to Mildura were for the line's opening in 1903; the first special had sleeping accommodation in ordinary car No.29 and extra car 6ABAB, while the second used ordinary car No.30 and extra car 5ABAB.[21] Cars 29 and 30 were Mann Boudoir sleeping cars nominally allocated to the interstate Melbourne and Adelaide expresses,[22]:78 while the two ABAB cars were ordinary clerestory-roofed sitting carriages with access doors either side of each compartment, no corridor, vestibule or diaphragms; half of each car was allocated to First Class passengers and the other to Second Class. The outer two compartments were for ten smoking passengers each and had no access to the internal lavatories, while inner four compartments (one general, one Ladies for each class) had a five- and a four-seat bench, then a narrow corridor on one side to access the lavatory half-compartment built for that section in something of an interlocking ℕ-shape. Between the two lavatory compartments of each side there was a small void for a water tank. The twelve total seating benches (eight long, four short) could be lifted up to make room for sleeping accommodation.[23]:33

Early services

[edit]

Printed shortly after the line opened, a Bradshaw's Guide dated sometime between 1903 and 1907[24] indicates a Mixed service (combined goods and passenger train) from Castlemaine, reversing after spending about two hours at Maryborough, twice per day (Sundays excluded) as far as St Arnaud. The morning train would continue to Donald, then to Birchip (Mondays and Wednesdays excluded), to Woomelang (Saturdays excluded), and on to Mildura (Thursdays excluded), with the two remaining weekly services arriving at Mildura around 6 am on the Wednesday and Saturday. The afternoon train would continue from St Arnaud to Donald only on Tuesdays, Thursdays and Saturdays, arriving 10:40 pm.[24]:40

Up direction services were a Monday and Wednesday-only Mixed train from Mildura at 5:35 pm, passing Woomelang around midnight and arriving Donald at 5:15 am the next day; from Donald a train would depart six days per week at 5:50 am to Maryborough and Castlemaine, connecting with a through passenger train. there was an additional service from Woomelang on Fridays at 7 am, joined on Mondays from Birchip and Wednesdays from Donald, then all days from St Arnaud to Castlemaine.[24]:41

Sleeping cars were provided on the Mildura service.[24]:40–41 Assuming the given date of c.1903 to 1907 is accurate, these were probably the permanent allocation the two ABAB cars discussed above.

See also

[edit]

References

[edit]
  1. "Mildura's Riverfront Railways" Australian Railway Historical Society Bulletin February 1978 pages 33–38
  2. "The Mildura Story The Battle of the Routes" (PDF). Royal Historical Society of Victoria. Archived from the original (PDF) on 19 July 2008. Retrieved 30 August 2008.
  3. "WORKS BEGIN ON MILDURA RAIL FREIGHT UPGRADE". minister.infrastructure.gov.au. Archived from the original on 24 July 2008. Retrieved 27 April 2008.
  4. "Roads, ports and freight – Mildura Rail Freight Upgrade – Frequently asked questions". doi.vic.gov.au. Archived from the original on 26 July 2008. Retrieved 27 April 2008.
  5. "$43m to upgrade rail freight lines". business.theage.com.au. Retrieved 27 April 2008.{{cite web}}: CS1 maint: deprecated archival service (link)
  6. V/Line Weekly Notice: "NORTH BALLARAT – MARYBOROUGH. TOURELLO LOOP ABOLISHED LEVEL CROSSING UPGRADES"
  7. "Signalling and Infrastructure" Railway Digest May 2010 page 56
  8. "Victorian Government press release—"NORTH WEST PUBLIC TRANSPORT REVIEW REPORT RELEASED", 13 October 2010". Archived from the original on 21 October 2010. Retrieved 1 November 2010.
  9. "North West Public Transport Review". Archived from the original on 21 October 2010. Retrieved 1 November 2010.
  10. "V/Line Annual Report 2009-2010" (PDF). V/Line Pty Ltd. September 2010. p. 7. Archived (PDF) from the original on 27 February 2011. Retrieved 2 July 2011.
  11. "Transport Projects – Maryborough Rail Services". Department of Transport website. Department of Transport. Archived from the original on 7 January 2010. Retrieved 2 July 2011.
  12. Probert, Oliver (1 August 2017). "Murray Basin upgrades begin". Rail Express. Archived from the original on 21 January 2021. Retrieved 18 February 2018.
  13. DiFabrizio, Michael (14 February 2018). "Birchip stretch in train". Sunraysia Daily. Archived from the original on 13 February 2018. Retrieved 18 February 2018.
  14. "VLine Station Patronage 2013-2021.xlsx". Google Docs. Archived from the original on 10 March 2022. Retrieved 10 March 2022.
  15. "Roads, ports and freight – Intermodal terminals". doi.vic.gov.au. Archived from the original on 4 June 2009. Retrieved 1 August 2008.
  16. "Rail and Road – Seaway". www.seaway.com.au. Archived from the original on 11 February 2022. Retrieved 22 February 2022.
  17. "Melbourne–Mildura Corridor Strategy" (PDF). Building our National Transport Future. Department of Transport and Regional Services. June 2007. Archived from the original (PDF) on 27 October 2009. Retrieved 3 November 2009.
  18. "Wongm's Rail Gallery – Mildura freight". wongm.railgeelong.com. Archived from the original on 27 October 2009. Retrieved 3 November 2009.
  19. Maryborough Rail Services Victorian Transport Plan
  20. Passenger trains return to Maryborough Archived 2 April 2015 at the Wayback Machine The Courier 25 July 2010
  21. "Mildura opening". The Argus. Melbourne, VIC. 12 November 1903. p. 6. Retrieved 1 June 2026 via Trove.
  22. Burke, David (1978). Great steam trains of Australia. Rigby.
  23. Victorian Railways (2008). Rolling Stock Branch diagrams & particulars of locomotives, cars, vans & trucks, as at 1914. Australian Railway Historical Society. ISBN 9781920892173.
  24. 1 2 3 4 Victorian Railways (1905). "Bradshaw's Guide" (Timetable). Bau, M. Retrieved 1 June 2026.
[edit]