Building an MS Project-Style Gantt Chart in Flutter Web
The Goal
Visualize WBS (Work Breakdown Structure) progress with a synchronized task list on the left and a scrollable timeline on the right — like MS Project, but in Flutter Web.
Architecture
Row(
children: [
// Left pane: task names and assignees (fixed width)
SizedBox(width: 300, child: TaskListPane()),
// Right pane: timeline bars (horizontally scrollable)
Expanded(child: TimelinePane()),
],
)
Two ScrollController instances linked together keep vertical scroll synchronized between panes.
Implementation
Synchronized Scrolling
class _GanttChartPageState extends State<GanttChartPage> {
final _leftVertical = ScrollController();
final _rightVertical = ScrollController();
@override
void initState() {
super.initState();
_leftVertical.addListener(() {
if (_rightVertical.offset != _leftVertical.offset) {
_rightVertical.jumpTo(_leftVertical.offset);
}
});
_rightVertical.addListener(() {
if (_leftVertical.offset != _rightVertical.offset) {
_leftVertical.jumpTo(_rightVertical.offset);
}
});
}
}
Drawing Gantt Bars with CustomPaint
class GanttBarPainter extends CustomPainter {
final List<WbsTask> tasks;
final DateTime startDate;
final double dayWidth;
@override
void paint(Canvas canvas, Size size) {
final paint = Paint();
for (int i = 0; i < tasks.length; i++) {
final task = tasks[i];
final y = i * 40.0 + 8;
final startX = task.startDate.difference(startDate).inDays * dayWidth;
final barWidth = task.duration.inDays * dayWidth;
// Background bar
paint.color = _progressColor(task.progressRate).withAlpha(80);
canvas.drawRRect(
RRect.fromRectAndRadius(
Rect.fromLTWH(startX, y, barWidth, 24),
const Radius.circular(4),
),
paint,
);
// Progress fill
paint.color = _progressColor(task.progressRate);
canvas.drawRRect(
RRect.fromRectAndRadius(
Rect.fromLTWH(startX, y, barWidth * task.progressRate / 100, 24),
const Radius.circular(4),
),
paint,
);
}
}
Color _progressColor(int progress) {
if (progress >= 100) return const Color(0xFF4CAF50); // done: green
if (progress >= 50) return const Color(0xFFFF9800); // in progress: orange
return const Color(0xFFFF5722); // behind: red
}
@override
bool shouldRepaint(GanttBarPainter old) =>
old.tasks != tasks || old.startDate != startDate;
}
WbsTask Model
class WbsTask {
final String id;
final String title;
final String? assignee;
final DateTime startDate;
final Duration duration;
final int progressRate; // 0-100
final List<String> dependencies;
}
Supabase Schema
CREATE TABLE wbs_tasks (
id uuid PRIMARY KEY DEFAULT gen_random_uuid(),
title text NOT NULL,
start_date date NOT NULL,
end_date date NOT NULL,
progress_rate int DEFAULT 0 CHECK (progress_rate BETWEEN 0 AND 100),
dependencies uuid[],
user_id uuid REFERENCES auth.users(id)
);
Gotchas
shouldRepaint performance
Returning true always causes per-frame repaints. Check if data actually changed:
@override
bool shouldRepaint(GanttBarPainter old) =>
old.tasks != tasks || old.startDate != startDate;
Alignment between header and bars
The date header (month/day labels) and the actual bar positions must use the same startDate and dayWidth constant. Compute both in the parent widget and pass them down.
Conclusion
Flutter Web's CustomPaint handles complex visualizations that existing widgets can't. For Gantt charts with custom grid layouts, painting from scratch gives you full control — and the performance is fine for typical WBS sizes (< 200 tasks).